Red Childress
12-10-2008, 10:26 AM
I just spoke with the ACEngineers at Kinzua Dam and they DO plow/salt the launch access at the tailwaters the best they can. It is open and clear right now. During periods of heavy snowfall and plowing is not frequent enough to keep the launch access road clear, they will pull a chain across the road and close it. If you have launched your boat in the morning and then the extreme snow fall comes, they WILL NOT CLOSE THE LAUNCH WHILE THERE IS A TRAILER IN THE PARKING LOT.
There were a couple of years before the launch was upgraded (1993-1995) and plowing was not happening that I would take my 14ft. jon boat apart and carry/slide the pieces down the launch road, put the boat back together and fish. Then I would tie a rope around my waist with 20hp prop engine laying in the floor and drag everything back up the hill, put the boat back on the trailer and attach the engine and go home. Those days are over now.
If you ever need to call ahead to find out if the launch access is open, the number is 814-726-0661. Hours are 8-4 if you want to speak to a human.
There were a couple of years before the launch was upgraded (1993-1995) and plowing was not happening that I would take my 14ft. jon boat apart and carry/slide the pieces down the launch road, put the boat back together and fish. Then I would tie a rope around my waist with 20hp prop engine laying in the floor and drag everything back up the hill, put the boat back on the trailer and attach the engine and go home. Those days are over now.
If you ever need to call ahead to find out if the launch access is open, the number is 814-726-0661. Hours are 8-4 if you want to speak to a human.