Thread: 502 Condition

  1. #1

    Default 502 Condition

    Herbie, they were working hard on 502 all last summer. Can you give everyone an update on it now that you have arrived?

    Thanks!

    Steve Viltoft

  2. #2

    Default 502

    502 is in excellent shape at this point having sveral of the bad stretches redone last summer and i haven't heard of any projects scheduled formthis year if i do i'll be sure and update.
    at this point it is good roads/hwys right to our driveway whether coming from south east or west.
    Andy Myers Lodge
    Steve Herbeck

    Web Site: http://www.andymyerslodge.com

  3. #3
    Join Date
    May 2008
    Location
    Vermilion Bay, Ont.
    Posts
    12

    Default

    The word is that they Pioneer Construction is going to be working on the 502 this summer.
    Can't remember where ..
    Supposed to start the week of May 10th, earlier if weather permits ..

    Will talk to friend that works for them and get you a definite location and start time ..
    Ken G

  4. #4

    Default 502

    just got back from running to inter falls for some elec supplies and there is a short stretch it looks like they will be working on.
    also the bridge on hwy 17 at eagle river will be getting finished.
    if you're concerned at all about delays there is the route taking hwy 11w to 17 turning left at the end towards vb.
    Andy Myers Lodge
    Steve Herbeck

    Web Site: http://www.andymyerslodge.com